A par level is the amount of a product you want on the shelf so that you never run out before the next delivery and never sit on more than you need. Set it once, review it monthly, and ordering stops being a memory game.

By Matteo Talone, founder of MISE, 20 years in Michelin-starred restaurants and five-star hotels · Updated November 2026

In short

  • Par = daily usage × days until the next delivery + safety stock.
  • Order quantity = par − what you have on hand when you order.
  • Review pars monthly, and adjust them for weekends, events and the season.
  • A par that is too high turns into waste; too low turns into emergency runs.

The formula

  1. Find the average daily usage: what you used over the last two to four weeks ÷ the number of days.
  2. Count the days the stock must last: from this delivery to the next one, plus the supplier's lead time if you order in advance.
  3. Add safety stock for busy days and late deliveries, often one day of usage.
  4. Par = daily usage × days + safety stock.

From par to order

On order day, count what is on the shelf and order the difference: order = par − on hand. Round to the supplier's pack size. If you have more than the par, order nothing.

When to change a par

  • Weekends and holidays: a separate par for busy days.
  • Events and banquets: add the event's needs on top of the par, don't raise the par for good.
  • Menu changes: a new dish changes the usage of every ingredient in it.
  • Season: produce, drinks and covers all move with it.
  • Short shelf life: keep the par low and order more often.

Signs your pars are wrong

  • The same product goes in the bin every week: the par is too high.
  • Someone runs to the cash & carry: the par is too low or usage changed.
  • Stock value keeps growing while covers don't.

Example

Worked example: tomatoes

Daily usage (last 4 weeks)6 kg
Delivery every 3 days× 3 days = 18 kg
Safety stock (1 day)+ 6 kg
Par level24 kg
On hand at order time9 kg
Order15 kg

If Friday and Saturday use 9 kg a day, set a weekend par instead of raising the par for the whole week.

With MiseAI

MiseAI sees your stock and par levels, outlet by outlet.

Ask it, for example:

  • “What should I reorder for the weekend?”
  • “Which products are below par right now?”
  • “What did we throw away most this month, and what did it cost?”

How MISE does it

MISE keeps stock per outlet with minimum levels, deliveries, transfers and usage, your supplier list with prices, and a waste log by day and category. The products below par are the first thing the AI assistant sees when you ask what to order.

See the feature →

FAQ

Questions

What is a par level in a restaurant?

The quantity of a product you want on hand to cover usage until the next delivery, plus a small safety margin.

How often should par levels be reviewed?

Monthly, and every time the menu, the season or the delivery days change.

Is a par level the same as a minimum stock level?

Not quite. The minimum is the point at which you reorder; the par is the level you order up to. Many kitchens use one number for both to keep it simple.

Should bar and kitchen have separate pars?

Yes, and per outlet if you have more than one. Each one has its own usage and delivery days.

More guides

Your next service, without the spreadsheets.

14-day free trial with every module. No credit card.